Loading Events

« All Events

  • This event has passed.

VRCA – CM-Lean Modules 3 & 4: Lean Work Structuring/Last Planner System

March 12, 2020 @ 8:30 am - 4:30 pm

Vancouver Regional Construction Association – CM-Lean Modules 3 & 4: Lean Work Structuring/Last Planner System

Lean Workstructuring is the first of two units that introduces the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, instructor-led course describes the process of Lean Workstructuring. Following this course, you will be able to:

Apply the methods and tools utilized in pull planning
Describe the concept of Lean Workstructuring
Outline the desired outcomes of Lean Workstructuring
Describe the characteristics and application of the Last Planner® System
Module 4:

The Last Planner® System is the second of two units introducing the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, facilitator-led course shows how to conduct makeready and weekly work planning sessions. Following this course, you will be able to:

Apply the Last Planner System on a project;
Hold make-ready and weekly work planning sessions; and
Calculate, track and analyze percent plan complete for a project
Upon completion of all seven CM-Lean modules, participants will be qualified to take the AGC Certificate of Management – Lean Construction exam.

Date: March 12, 2020
Time: 8:30 a.m. – 4:30 p.m.
Location: VRCA Office, 3636 East 4th Avenue, Vancouver
Cost: $799 / $899
Learning Units (LUs): 7 Non-core
Register: Click here

Venue

Vancouver Regional Construction Association
3636 East 4th Avenue
Vancouver, BC V5M 1M3 Canada
+ Google Map