AIBC

Architectural Institute of British Columbia

  • AIBCRegister
  • RegistrantLogin
  • Contact Us
Menu
  • About
    • Organization
    • Regulatory Authority
    • Governance
    • Professional Governance Act Transition
    • Committees & Advisory Groups
    • Annual General Meeting
    • Opportunities
    • Staff
    • Contact Us
    • Close
  • Registration
    • Become an Architect AIBC
    • Architects
    • Intern Architects
    • Architectural Technologists
    • Retired Architects
    • Firm Registrants
    • Temporary Licensee (Architect)
    • Honorary Registrants (Legacy) – Formerly “Honorary Members”
    • Good Standing
    • Professional Mobility
    • Annual Renewal
    • Close
  • Programs & Services
    • Practice Advice
    • RFPs & Competitions
    • Contracts
    • Certified Professional (CP) Program
    • Post-Disaster Building Assessment
    • AIBC Classifieds
    • Municipal Matrix
    • Close
  • Professional Development
    • Continuing Education System (CES)
    • AIBC Courses & Professional Development
    • Recognized Educational Provider Program
    • Close
  • Protecting the Public
    • AIBC’s Regulatory Role
    • Does Your Project Need an Architect?
    • Complaints
    • Professional Conduct
    • Illegal Practice
    • Close
  • News & Events
    • News
    • Calendar
    • Signature Events & Programs
    • Architectural Walking Tours
    • Media
    • AIBC 100
    • Close
  • Resources
    • AIBC Resources
    • Industry Resources
    • Affiliates
    • AIBC Register
    • Close
Home / News / Industry News / BC Codes Update for Mass Timber Construction

BC Codes Update for Mass Timber Construction

May 1, 2024

Updates have been made to the BC Building Code 2024 and BC Fire Code 2024. Revision 1 to both codes was published on April 10, 2024. The revisions expand permissions for encapsulated mass timber construction (EMTC).

The BC Building Code changes:

  • Enable taller EMTC buildings, up to 18 storeys for residential and office buildings from the previous 12-storey limit,
  • Add new EMTC building types – including schools, community centres, care facilities, retail, and light- and medium-hazard industrial in addition to residential and office buildings, and
  • Change encapsulation requirements, allowing for more mass timber to be exposed depending on a building’s height and use.

Changes to the BC Fire Code add new options for course of construction fire protection in EMTC buildings.

The code changes are in force now. You can read more about them on BC Gov News and access Revision 1 of both the BC Building Code and BC Fire Code on the Errata & Revisions page of the Building Codes and Standards website.

Additionally, new Technical Bulletins for BC Building Code 2024 have been published. More will be added as they are finalized.

For more information, please e-mail MassTimberImplementation@gov.bc.ca or visit BC Codes—Province of British Columbia (gov.bc.ca)

Filed Under: Industry News

« Previous Post
Next Post »
  • News & Events
    • News
      • AIBC Happenings
      • Industry News
      • eNewsletter Archives
    • Calendar
    • Signature Events & Programs
      • Induction & Retirement Ceremony
      • Conference and PD Day
      • Volunteer Recognition Program
        • Recognition for Lifetime Volunteer Achievement
        • Recognition of Exceptional Volunteer Service
        • Emerging Volunteer Recognition 
      • Scholarship & Bursary Program
      • Architectural Walking Tours
      • Architecture Centre Gallery
        • Current Exhibit
        • Past Exhibits
      • Architectural Awards
        • architectureBC
    • Media
    • AIBC 100

Main Pages

  • Home
  • About
  • Registration
  • Programs & Services
  • Professional Development
  • Protecting the Public
  • News & Events
  • Resources

Contact Us

Architectural Institute of B.C.
100 – 440 Cambie Street
Vancouver, British Columbia
Canada V6B 2N5
Tel: 604.683.8588
Email: aibc@aibc.ca

Follow us

Quick Links

  • Sitemap
  • Privacy Policy
  • Terms and Conditions
  • Contact Us

Copyright © 2026 AIBC